System structure

ProjectReplacement of the Röti Bridge
New construction pedestrian footpath
T12 Rötistrasse Solothurn
Gussasphalt Surface LayerMA 11 THP E spez.
Gussasphalt Tack LayerMA 16 HP E spez.
Waterproofing bridgePBD AE Pont GA 5
Sealing2 layers epoxy resin
Area bridge4'000 sqm
Area footpath 500 sqm
Surface chippingChipping 3/6, pre-coated with clear bitumen
OwnerKanton Solothurn
PlannerPlanergemeinschaft Quadras, c/o Bänziger Partner
ClientImplenia AG
Date of completionApril 2007 - September 2007

Project information

In 2003 the owner decided to tear down the old bridge and replace it by a new bridge with suspended footpath. Regarding the pavement structure, the owner opted for waterproofing bonded throughout to polymer bitumen sheeting and a two-layer, highly stable Gussasphalt pavement. The integrated track trenches were bedded on special elastic mats and backfilled with a specially adjusted Gussasphalt.

pia_1.png

Execution

Execution of the waterproofing and paving work was conducted in several phases with full closure of the bridge new building. On account of the changing cross slopes, machine laying was conducted one lane at a time (length approx. 150m, width approx. 6.50m). The mastic asphalt in the track trench was installed by hand.

Structure

Surface chipping:
Chipping 3/6, pre-coated with clear bitumen
Topping:
37mm MA 11 THP E spez.
Binder course:
43mm MA 16 HP E spez.
Waterproofing:
5mm PBD AE Pont GA 5
Epoxy resin:
Priming and sealing
Concrete substructure

pia_3.png

Summary

Employing the latest technological knowledge and choosing the optimal pavement design, Aeschlimann AG was able to satisfy the high demands on the system structure in the interest of the ownership.

pia_2.png