System structure with Gussasphalt on bridges
System structure
| Project: | Lucerne, repair Ibach bridge |
| Gussasphalt Surface Layer: | SMA 11 40mm |
| Gussasphalt Track Layer: | MA 11 HP 35mm |
| Gussasphalt Protective Layer: | MA 11 HP 35mm |
| Waterproofing: | PBD EP 5 GA |
| Sealing: | 2 layers epoxy resin |
| Surface levelling: | Epoxy resin - scratch coat |
| Area: | 4000 m2 |
| Surface chipping: | Chippings 4/8 on tack coat (Prov. roadway) |
| Owner: | Canton of Lucerne, Federal Roads Office (FEDRO) |
| Planner: | Emch + Berger WSB AG, Luzern |
| Site management: | Gebr. Brun AG, Emmenbrücke |
| Client: | Anliker AG, Emmenbrücke |
| Date of competion: | April 2008 - August 2008 |
Project information
The Ibach bridge in Emmen-Süd crosses the A2, the Kleine Emme and the Reuss.
Rehabilitation of the bridge will be under traffic, in stages, concomitant with limited space.
Execution
5 stages at 150 - 1000 m2 each, under traffic
Width: each stage 2.8 - 3.5 m
Length: each stage 30.0 - 100.00 m