System structure with Gussasphalt on bridges
System structure
| Project | Aarebrücke Stilli B-034 |
| Gussasphalt Surface Layer |
MA 11 THP |
| Gussasphalt Tack Layer |
MA 11 THP |
| Waterproofing | MA 8 TSP |
| Separatioin layer | Oiled paper |
| Edge sealing | Sealant - two layers epoxy resin and PMB strips |
| Area | 1'500 sqm |
| Surface chipping | Chipping 4/8, bitumen pre-coated |
| Owner | Tiefbauamt Kanton Aargau |
| Planner | Gerber + Partner, Windisch |
| Site management | Gerber + Partner, Windisch |
| Client | Construction Department, Traffic and Environment of the Canton Aargau, Department of Civil Engineering; |
| Date of Completion | Juni 2007 - Oktober 2007 |
Project information
Due to increasing traffic density and growing traffic loading, the roadway pavement and the drainage of the Aare bridge Stilli had to be renewed on a length of approx. 200m. In this connection, the existing footpath was widened and provided with a Gussasphalt pavement.
Execution
Execution of the paving work was conducted in several closely coordinated construction phases. To avoid full closure of the bridge, the work was completed one lane at a time.
Structure
Surface chipping 4/8, bitumen pre-coatet
Topping
MA 11 THP 37mm
Tack coat
MA 11 THP 70mm (2x35mm)
Waterproofing, floating
MA 8 TSP 25mm
Separation layer of oiled paper
Edge sealing: epoxy resin sealant and PMB strips
Concrete construction

Summary
The construction phases laid down in the construction programme were further accelerated by joint considerations of all parties involved in the construction. Aeschlimann AG was able, through its great flexibility, to implement the ideas in the interest of further schedule tightening to the fullest satisfaction of the owner. Despite most limited space, the traffic obstructions were reduced to a minimum.